About Ring spinning frame:
Spinning is the final step of yearn manufacturing process. The working procedure of ring spinning frame is taking the roving comes from simplex and produced yarn by reducing the weight of unit length. Ring is attached around bobbin. The traveler rolling on ring and enfold the yarn on bobbin. Ring spinning frame plays the vital role to spinning the yarn so it is called Ring spinning frame. Ring spinning frame’s production system is conventional.
Technical specification of modern ring frame
Ring frame is only one machine which can produce yarn by any kind of fiber. Basically the working system of ring spinning frame is easy and the cost of machine is a little cheap. It is easy to separate the bobbin from ring and easy to carry. but a few problem also reduce its popularity like, working speed, conventional system, large amount of electricity consumption. please follow the link to know more about rotor spinning frame and ring spinning frame.
Technical specification of modern ring spinning frame:
No |
Description of parts |
Specification |
01 |
Roller and angle |
45˚ |
02 |
The distance between center of lappet hook and center of front roller. |
66.50 mm |
03 |
Gage |
70.00 mm |
04 |
Tube length (gage -70.00 mm) |
201, 220, 230 mm |
05 |
Mechanical speed |
25,000 mm |
06 |
Count |
From 5.5s to 120s |
07 |
Twist/inch |
From 4 to 55 |
08 |
Draft system |
Double apron 3 roller to arm. |
09 |
Number of spindle |
From 96 to 1008 |
10 |
Main motor |
Down 15KM, High 37KM (45KW with Inver ) |
11 |
Ring lowering motor |
0.35KW |
12 |
Suction motor |
0.35KW |
13 |
Pantograph drive |
2.20 KW |
14 |
Horizontal transport belt |
2×0.12 KW (Geared motor) |
15 |
Inclined transport belt |
2×0.185 KW (Geared motor) |
16 |
Tube feeding |
2.5 Minutes |
17 |
Doffing time |
2.5 minutes |
18 |
Bobbin discharge speed |
60 (30+30) Minutes |
19 |
Compressed air consumption |
1.35 liter/minute |