1. Stringing shall be done after blasting and trenching when ROU is in rocky area.
2. Coated pipes shall be strung on approved soft earth/sand filled bag and wedge in such a way that bottom of the coated pipe remain above ground.
3. Pipes shall be supported at minimum two location.
4. Pipe number, Heat Number, Coat number and length shall be transferred and recorded in serial order.