Painting of Piping and Equipment

High Quality painting of Structures, Equipment and Piping Systems to avoid corrosion is essential for long life of a constructed plant. Various types of markings are also required to be painted all over the part of the plant.

Clause

Details

PNT-FAB-001

Painting Specification is prepared by Material Engineer to assure high quality painting work on the project as per international standards.

PNT-FAB-002

Painting includes surface preparation, selection of paints, application of paints on external surface of piping and equipments.

PNT-FAB-003

Un-insulated carbon steel pipes, fittings, valves, special items etc. require painting.

PNT-FAB-004

Carbon steel ducts, furnaces and stacks require painting.

PNT-FAB-005

All un-insulated equipments like columns, vessels, drums, heat exchangers, pumps, compressors, electrical panels, motors etc. require painting.

PNT-FAB-006

All structural componets like steel members, platforms, ladders,handrails etc. required painting.

PNT-FAB-007

Identification marks, color bands are also required to be painted.

PNT-FAB-008

Painting over insulation cladding is required. (Marking).

PNT-FAB-009

In some cases, painting under insulation also required for carbon steel piping.

PNT-FAB-010

Plastic or plastic coated components do not required to be painted.

PNT-FAB-011

Non-ferrous materials like Aluminium are not required to be painted.

PNT-FAB-012

Final painting shouldbe done only after all tests are performed on the piping system.

PNT-FAB-013

Various international codes and standards should be followed for painting.

PNT-FAB-014

Surface preparation is critical to ensure clean surface so that paint film adheres securely to the surface.

PNT-FAB-015

Various methods of surface preparation are used like Hand Tool Cleaning, Power tool, Blast Cleaning etc.

PNT-FAB-016

Environmental factors such as Rain, Wind, Temperature, Humidity must be considered while painting.

PNT-FAB-017

Normally primare should be applied within 4 hours of surface preparation.

PNT-FAB-018

Paint is applied using brush, air spray equipment etc. as per relevent standards.

PNT-FAB-019

Proper documentation regarding painting process must be maintained by the contractor and submitted to the client.

PNT-FAB-020

Field safety and hygiene must be maintained at all times during painting work.