Basic engineering documents

Pipe rack study sketches:               

These are prepared taking into account requirements of piping, electrical & instrument cable trays to be routed between various plant areas.

These documents are used by civil, piping, electrical and instrument group to prepare detailed construction drawings.

Study piping layouts:

Prepared to show routing of critical process lines which could affect functioning of plant. This document reviewed by process licensor and forms basis of detailed piping layout drawings.

Piping specifications:

These documents specifies in detail all piping items required for the plant.

Various piping items required for a particular duty condition, depending on type of fluid; line pressure & temperature are listed under one specification class.

        Utility flow diagram (UFD)

        This document is similar to P&ID’s

        Prepared based on utility summary

        Prepared based on utility summery furnished by process group

        Shows utility generation and distribution in the plant.

Line numbering and line list

All process and utility lined appearing in P&ID’s and UFD’s are given unique serial numbers on these documents the operating, design and test conditions, insulation & painting requirements are listed on line list.

Critical line list

All line requiring stress/vibration analysis etc. Are listed in this document

Piping Layouts

Document required to develop piping layout:

1) Equipment layouts  

2) Process P&ID’s 

3) Utility P&ID’S  

4) Line designation list  

5) Piping specification  

6) Equipment data sheets /vendor drawings  

7) Civil drawings  

8) Inline instrument details  

9) Insulation requirements

Following points shall be kept in mind while developing piping layouts

Process requirements e.g.

Slopes, vents & drains, barometric leg for vacuum lines

        Instrument requirements e.g.

        Straight length for flow measurement

        Location of control valves, safety valves,

        PLS, TIS, etc.

        Safety requirements

        Operations & maintenance

        Accessibility

        Service /hose stations, safety showers

Piping layouts is required by site for construction to prepare isometrics & into instrument group for hook-ups.

Piping layouts must consider

        Process requirements operations & maintenance requirements area classification

        Safety requirements factory inspector’s requirements TAC

        Requirements civil requirements erection / dismantling requirements future provisions.