1. Following type of markers shall be fabricated and installed along the pipeline route such that they do not cause any hindrance to the regular land user or traffic
1. Aerial Markers: At every 5 Kms.
2. Kilometer Markers: At every 1 Km. & as per Alignment sheet
3. Pipeline Warning Markers: At Road / Railway / River Crossings & Stations / Terminals
4. ROU Boundary Markers: At every 750 Mtrs. & as per Alignment sheet
5. Direction Markers: At significant turning points
6. Navigational Markers: At bank of Navigational Course
7. OFC Markers: At OFC Joints
2. ROU and all sites used for construction of pipeline , water crossing and other structures shall be restored as per satisfaction of authority having jurisdiction over it.
3. Damages to roads, bridges, fences etc. damaged during construction shall be restored to original.
4. The bed of water course shall be restore to the original level.
5. The banks and any excavated area shall be restored to original levels .
6. The banks shall also be stabilized.
7. On completion of clean-up, the ROU shall be restored to such stable and usable condition as may be reasonably consistent with the condition of the ROU prior to laying the pipeline.
8. The release note from the land owners regarding satisfactory indemnification and restoration of land shall be obtained from land owner.