Installing a solar panel, a
diesel generator and an inverter system may be quite easy. But how do we
integrate them to form a complete off the grid generator battery home back up
system? A simple circuit and wiring design will tell you how to live simply off
the grid. Read on.
With human population ever
increasing, our cities are growing more and more power hungry. Although the
government of each nation is trying their best to cope up with the problem but
the situation is getting grimmer as days pass by. As a result, frequent power
interruptions and load shedding have become quite a common occurrence in many
parts of the countries today. In the present scenario, for the newly built,
remotely located house, getting electric supply through the conventional means
seems highly unfeasible, mostly because of the uneven terrain and due to its
distance from the mainstream cities.
A cool solution for the above
problems in the form solar powered electricity may seem quite handy as it can
be harnessed easily, is available plentifully and what’s more, it’s totally
free of cost. Of late people have started understanding the potential benefits
of such a power source and have become pretty busy installing their own little
power grids made up of solar panels, batteries and inverters.
But, as we all know, every
good thing is always accompanied with a bit of snag. Solar powered electricity,
as the name refers, may be heavily dependant on
sun light. An over cast condition would then mean, the solar panels are
producing not enough power to charge the inverter battery and things may turn
quite gloomy inside your house.
Well, the solution may again
lie in the hands of Mother Nature. Ever wondered how your car battery always
remains charged and in a topped up condition whenever required? It’s the
powerful alternator inside every vehicle that keeps producing the required
charging current for the battery as long as the vehicle is running. Such a
diesel or petrol (fossil fuel) powered generator, when integrated with the existing
solar power generator to charge the inverter batteries, may prove to become an
ultimate off the grid generator battery home backup system.
Here we will learn how simply
the three units (solar panels, Inverter and the Alternator) may be wired
together so as to produce a continuous 24-7 supply of electric power to your
house.
We have included two batteries
in the system; while one is being used up by the inverter, the other gets
charged, through either the PV or the alternator and is kept ready to be replaced
when the first one gets discharged. Since the whole system is quite automatic,
the operations become very simple and user friendly.
We won’t discuss here
regarding the specifications and power (AH) delivering capacity of the units
(solar panel, inverter, battery, generator etc.) involved in the set up as it
would be better to leave it to the experts (dealers and manufacturers). They
will be in a better position to exactly judge the approximate power
requirements of a particular house and do the installations appropriately.
Moreover, if the installation specifications are optimized as per your
calculations, it may become difficult to get a refund or a reinstallation done
in case you miscalculate the parameters.
The circuit operation may be
understood through the following explanation:
Referring to the adjoining
figure (Click to Enlarge), let’s assume initially, one battery to be fully
charged and the other partially discharged.
Let the charged battery be
connected to “Battery #1" position and the discharged one to “Battery
#2" position.
Now, according to the shown
position of the 4-way switch, two things will instantly start happening: the inverter will be switched ON at once,
powering the entire house, and, if it’s quite sunny outside, the battery #2
(partially discharged) will start getting charged through the PV set up.
If, unfortunately, the climate
is not on your side, simply switch ON the diesel generator until the battery #2
is fully charged. The Ammeter will give you an instant indication of the
charging status. The charging process may take as long as 10 hours; keep a
watch on the ammeter, once it approaches the zero mark, you may switch OFF the
Alternator. This procedure has been purposely kept manual for safety reasons.
T1 along with R1, D1, and P1
form a self regulating automatic battery
charger circuit. It will strictly monitor the charging voltage of the uncharged
battery and will restrict any voltage from the PV or the generator once it gets
fully charged. So, the battery is ultimately always safe from over charging.
The 4-way switch will need a
manual toggling every time the low voltage indicator comprising of T2, P2, R2
and LD1 becomes active. The toggling would mean an instant changeover of the
discharged battery with the charged one, so that the cycle may start all over
again.
The next page will teach you
everything about the construction and the set up procedure for this off the
grid generator battery home backup system.
A simple set up of PV panels,
diesel generator, inverter and a couple batteries, when integrated to a small
homemade electronic voltage regulator circuit, provides an ultimate answer to
the question “how to live off the grid?", as far as electricity is concerned.
Learn the whole construction procedure here at Bright Hub.
The following components will
be required to build the present set up:
R1 = 10K 1/4W CFR,
R2 = 10K 1/4W CFR,
R3 = 2K7 1/4 W CFR,
P1, P2 = 10K Preset Linear,
T2 = BC557,
T1 = TIP 127 (one transistor
can handle 2 amps. maximum, so connect more transistors in parallel as
required),
LED = Red 5 mm,
D1, D2 = 3V3, 400mW Zener
Diode,
General Purpose PCB,
Heatsink For T1,
Metallic Enclosure = 1 no,
External Fittings = Sockets,
Fuse Holder, Plug etc.
*Rectifier Diodes = 5 nos,
*Ammeter = 1 no,
*4 – Way Changeover Switch,
Heavy Duty = 1 no,
*Solar Panel = 24 Volts
Maximum Output,
*Diesel Electric Generator =
24 Volts Maximum Output,
*Battery #1 and Battery #2 =
Two Sets of Battery,
*Inverter = 1 Unit.
* = All are rated for the
power requirement (CURRENT) of a particular house.
Caution: Transistor T1, all rectifier diodes and
the 4-way switch are critical components and will have to be suitably selected
for the power requirement of a particular house. Assistance of an electronic
engineer is strictly recommended.
A ready
made automated built-in battery charger set up with a solar panel or a
diesel AC generator is difficult to find and procure, or may be too costly and
complicated. The simple circuit design provided here will make almost
everything automatic and will cost you not even a dollar (barring the 4-way switch
and the ammeter)
The present discussion will
provide you a complete solution about how to live off the grid, as far as
electricity is concerned.
You may want the help of a
professional electronic engineer for building the little circuit and also for
the wiring tips.
The discrete electronic
components may be simply procured from your local electronic retailer and
assembled over a small piece of general PCB. The whole unit may be housed
inside a strong, clampable metallic box,
big enough to hold and support the circuit, the 4-way switch and the ammeter.
It also should have appropriately drilled sections for the various external
sockets and fittings.
Once the above construction is
completed, the setting procedure may be done in the following manner:
Initially, keep the PV panel,
the batteries and the inverter disconnected from the above unit.
Using an external 0 -24V DC
variable supply, apply a voltage of around 11 volts across POINT A and ground.
Slowly adjust P2 to make the LED glow at its maximum illumination. Now,
increase the voltage to about 13 volts, you will find the LED slowly dying OFF
and shut down. This sets up the low voltage indicator section.
Next, shift the external DC
supply across POINT B and ground, also connect the emitter of T1 with the
positive of the supply using a jumper wire. Now, increase the voltage to about
13.5 volts, start adjusting P1 until the ammeter just reads zero. This sets up
the over charge protection circuit.
Now the system is all set to
go. Plug in the inverter and the PV wires into the circuit box’s sockets. To
start with, connect two fully charged batteries into the two battery sections
and switch the system ON.
Immediately, the inverter
should switch into action powering up the whole house. You don’t have to bother
about the rest of the functioning of the system, as everything will be taken
care of appropriately and automatically as per the desired specifications. Just
remember to toggle manually the 4-way switch when you see the low voltage LED
glowing brightly. Also, during overcast conditions, switch the generator ON and
monitor the ammeter in between. When you find it “dead", it would mean the
battery is fully charged and supply to it has been restricted by the automatic
system. Now you may switch the generator OFF, just to avoid the unnecessary
wastage of diesel. During sunny days even this botheration will be eliminated
as then everything will be handled by the PV panels and the automatic battery
charger circuit.