Site Setting Out Survey
The method of setting out is the reverse of surveying process. The process involves the positions and levels of building lines and road alignments shown on the construction plans to be established on the ground by various techniques and instruments.
Methods of Setting Out Survey
Setting out buildings by coordinates
Setting out with theodolite and level
Checking verticality
Setting out and alignment in steel framed buildings
Alignment and verticality in form work
Control and calculation for route surveying
1. Setting Out Building by Coordinates
2. Checking Verticality:
To check verticality of points in a building, the following surveying instruments can be used:
· Plumb Bob (For buildings less than 20m in height).
· Optical Plummet (A transparent plastic sheet is used as a target for checking verticality of tall buildings).
· Theodolite
Setting out Survey works also include
·
· Simple Circular Curves
· Compound Curves
· Reverse curves
· Transition curves
· Vertical curves
· Setting out of horizontal alignment
· Setting out of vertical alignment
· Setting out of cross-sections
· Setting out of bends
Setting Out Tools and Equipment
· Pegs
· Tape measure/measuring wire
· Ranging rods
· Triangle sets
· Cross staff
· Optical square
· Gradient template
· Straight-edge in combination with spirit level
· Dumpy level
· Water manometer
· Tube water level
· Camberboard