The Olkaria II
Geothermal Power Plant is one of Kenya's largest geothermal power
plant having an installed electric capacity of 70 MW.
Olkaria II Power Station is currently Africa’ s largest Geothermal Power Station. It is
currently generating 70 MWe and is the
second geothermal plant that is operated by KenGen.
The power plant was commissioned in November 2003.
Olkaria II Geothermal Power Plant is located in the North Eastern Sector of the
greater Olkaria geothermal field. Wells
were drilled between 1986 and 1993 but construction of the power plant was
delayed until the year 2000 when funds became available.
The project was co-financed by the World
Bank, the European Investment Bank, KfW of
Germany and the Kenyan Government. Designed and constructed with an advantage
of newer technology, this state-of-the-art plant is highly efficient in steam
utilization.
Olkaria II Geothermal Power Plant operates on a single flash plant cycle with a
steam consumption of 7.5 tonnes per hour per megawatt generated. The turbines
are single flow six-stage condensing with direct contact spray jet condenser.
The Power generated is transmitted to the national grid via 220 kV double
circuit line to Nairobi. Olkaria II power
station is also connected toOlkaria I Power Station
by a 132 kV line.