THIRD PARTY SERVICE

The third party service providers make up about half of the workforce on an offshore rig. With so many hi-tech and specialized operations being performed at all stages of the drilling operations it’s imperative that experts in their field perform these tasks. The first group of people we’ll look at are the “mudloggers” who’s job it is to monitor the drilling operations from the time they “spud” the well to the time they secure the well after drilling and testing has been completed.

Mudloggers

“Mudlogger” is the generic term used to describe the field specialists who monitor the well and also collect samples for the geologist. The career progression for a “mudlogger” is to generally start as a sample catcher while they learn about the drilling operations, then progress to a mudlogger and with further experience, become a data engineer.

Sample Catchers

Dedicated sample catchers aren’t always part of the team but they often get “thrown in” as a complimentary part of the mudlogging services. They don’t need to have any prior experience in working offshore or as a mudlogger, so it’s a very good entry level job and is generally the starting position for graduate geologists who wish to work offshore. Although you don’t need to be a geologist to be a sample catcher, most of them will be and will go on to get trained as a mudlogger.

Sample catching is without a doubt the least glamorous and lowest paid of all jobs on the rig…but you have to start somewhere! The role of a sample catcher is to provide the most basic geological data acquisition on the rig and to assist with all general activities when possible. The main duties of the sample catcher are:

The sample catcher reports directly to the mudlogging crew who will ensure his duties are performed correctly. This may include on-the-job training as required. They work out of the mudlogging unit, which is always close to the shale shakers and these are generally one or two levels below the drillfloor. The shale shakers are vibrating screens that separate the drilling fluid from the drilled rock cuttings. The “shaker house” is a very noisy place and double hearing protection must always be worn. There will be multiple shakers to accommodate the large volume of cuttings that can be produced when the drilling rate of penetration is high (i.e. they are drilling fast!). It’s a very “dirty” job and multiple layers of personal protective equipment need to be worn to prevent skin contact with the drilling mud, which can cause serious skin inflammation.

Mudloggers and Data Engineers (DE)

Mudloggers and data engineers are responsible for gathering, processing and monitoring information pertaining to drilling operations. They don’t only collect data using specialist data acquisition techniques – they also collect oil samples and detect gases using state-of-the-art equipment.

The information amassed by these guys is analyzed, logged and then communicated to the team that is responsible for the physical drilling of the well. Without the help of the mudlogger, the drilling operations would be less efficient, less cost-effective and much more dangerous. The mudlogger is vital for preventing hazardous situations, such as well blowouts. They also provide vital assistance to wellsite geologists and write detailed reports based on the data that is collected. Being an entry-level position, employees will be given a mixture of ‘on-the-job’ training and expert in-house training courses, which cover different aspects of drilling operations. A major part of the training will focus on the use of specialist computer software.

Typically, you will need a degree in geology to start a career as a mudlogger. However, candidates with degrees in physics, geochemistry, chemistry, environmental geoscience, maths or engineering may also be accepted.

Along with the sample catchers and data engineers, the mudloggers work out of the muddlogging unit, which is a pressurized sea container-type of office, which is positioned close to the drillfloor and shaker house. The unit will have an air-lock compartment when you first enter it so as to maintain the positive pressure within the unit whenever somebody leaves or enters the unit. This is the main control room for monitoring the drilling operations and is full of sophisticated and delicate equipment and computer systems. Positive pressure needs to be maintained to ensure the air pressure inside the container is higher than that of the outside area to prevent contamination of sensitive monitoring equipment – and also to ensure the safety of the crew working inside the unit should the outside air become contaminated through uncontrolled releases of hydrocarbons from the well. 

One of the most important tasks of the mudlogger is to oversee the collection of not only geological samples but also mud and gas samples from the well during drilling operations. To be able to do this accurately they have to know the exact “lag time” (or “bottoms-up time”) that it will take for the drilled cuttings or mud and gas to arrive at the surface after being drilled and circulated up the outside of the drillhole (annulus) while suspended in the drilling mud. The lag time may be a few minutes in a shallow hole or as much as several hours in deep wells with low mud flow rates. To be able to work this time out accurately there are many factors that have to be taken into consideration. The lag time depends on:

While the computer’s software will work this out automatically, the calculated value may be incorrect however, if the operator has entered erroneous or incomplete values for the pipe or hole dimensions, or if the hole is badly washed out. This has to be monitored very carefully to avoid catching mud, gas and cuttings samples at incorrect depths.

Sensors

The mudloggers and DEs monitor the drilling operations via a series of sensors that are placed at various locations around the drillfloor, pit room and shaker house. The main drilling and mud parameters that are recorded are: hook movement, weight on hook, standpipe pressure, wellhead pressure, rotary torque, pump strokes, RPM, mud pit levels, mud density, mud temperature, mud resistivity and mud flow. These parameters are monitored in real time and any deviances from the expected normal values must be immediately reported to the driller. The DE will view and monitor all the drilling parameters on a screen as shown below.

The five most important monitoring tasks that the mudlogger and DE must watch out for are:

The mudlogging unit is a very confined workplace and there may be up to several people working in there at any one time, especially if it’s a “combo” unit, which houses the mudloggers, MWD engineers and possibly also the directional driller. Generally the same service provider company performs all of these roles so it is quite common for data engineers to progress into a role as an LWD/MWD engineer. Other common career progressions for mudloggers/data engineers are as a wellsite geologist or drilling fluids engineer (mud engineer). 

The complete list of responsibilities of the mudloggers is too exhaustive to detail in this article but the above-mentioned roles are the main ones. Like most jobs on the rig, daily reports are a big part of the data engineer’s responsibilities. The mudloggers report directly to the wellsite geologist, who is generally working in the mudlogging unit alongside them. Because the mudloggers are required to monitor the drilling operations from the commencement of drilling they will always be employed on a permanent rotating roster, which is generally 4-weeks on, 4-weeks off.